Desk · Resource definition · HREE-heavy
ASX:VMM
Viridis Mining
Colossus ionic-clay project, Poços de Caldas. Another Brazilian clay in the Caldeira neighborhood — met, MagREO and permits vs Meteoric are the compare.
Stalled
Pulse Timeline
Isoelectric line is the baseline Pulse. Spike height is catalyst strength. Wide gaps or a flat line = stalled progress / life support.
- 1) 12-01 PEA
Lead II · 25 mm/s · Pulse 10 mm/mV · snapshot 2026-08-22
Life support
Isoelectric. No material beat in the window. A listing is not vitality.
- Last beat
- —
- Beats / 90d
- 0
- Recent gap
- —
0 beats in 180d
- — No dated beat in the trailing window.
- — Next: PEA / offtake process (101d).
Trading
- Last
- A$0.550
- 1d
- +3.7%
- Mkt cap
- $95M
- Volume
- 1.6M
- 52-week
- A$0.18 – A$0.92
- 1m
- —
- 3m
- —
- 1y
- —
Shares — · EV / MagREO $4.8M/kt · snapshot, not a live tape
Company & people
HQ
Perth / Brazil
Focus
HREE-heavy · Ionic clay
CEO Rafael Moreno
- Rafael Moreno, CEO
Mine / project
Flagship
Colossus
Location
Poços de Caldas, Brazil · Brazil
Deposit
Ionic adsorption clay
Resource
Ionic-clay MRE in the same alkaline complex as Caldeira. Grade/MagREO split vs Meteoric is the only compare that matters.
Desk basket
20 kt MagREO (desk)
Radioactivity
Low — permit tell vs peers
Capital, loans, grants & support
None the desk is willing to count yet.
The Pulse
Neighborhood is the pulse — and the risk of being the second clay in the same complex. Need a PEA and a MagREO table, not a map overlay.
ASX. Too early.
Next: 1 Dec 2026 — PEA / offtake process
Nasdaq path
Home listing is not Nasdaq. Bid price, registration, and a real asset gate are.
- 01 · DoneASX listing
Primary listing VMM. Colossus sits next to Caldeira — neighborhood is the pulse and the risk.
- 02 · GapUS OTC
No US ticker.
- 03 · GapDTC eligibility
Not in play.
- 04 · GapUS holder tape
Second clay in the same complex. Allocators will pick a winner after PEAs, not before.
- 05 · NextPEA / MagREO vs Meteoric1 Dec 2026
Need a MagREO table, not a map overlay.
- 06 · GapSEC registration
Too early.
- 07 · GapNasdaq $4 bid
Last ~A$0.55 / ~US$0.36.
- 08 · GapNasdaq application
ASX. Too early.
Catalysts
PEA / offtake process
Desk note
Stays on this device. Not the press release.
Pulse = Catalyst proximity + government/strategic support + Nasdaq-path / listing signals + valuation & execution + stage progress. Method
